lad-website/cline_docs/progress.md
TheMaddax edb6faa351 feat: create project structure and update implementation files
- Created complete project directory structure:
  - Frontend with Next.js 15.2.3 app router structure
  - Backend with Express API endpoints
  - Docker configurations with security best practices
  - MongoDB initialization with schema validation
  - Nginx configuration with security headers

- Implemented core file templates:
  - Custom video player with transcript display options
  - MongoDB schemas with validation for Videos and Members
  - JWT authentication middleware with role-based access control
  - Docker Compose with resource limits and security
  - Frontend/backend package.json with dependencies

- Updated documentation:
  - Enhanced TECH_STACK with latest version details
  - Updated TO_DO.txt with WCAG 2.2 AA requirements
  - Updated planned_implementation.txt with current best practices
  - Refreshed all Memory Bank files with current state

- Security and accessibility improvements:
  - Added MongoDB 7.0 schema validation with
  - Enhanced video requirements with mandatory transcripts and thumbnails
  - Updated accessibility to WCAG 2.2 AA standards
  - Added security best practices for Docker deployments
2025-03-25 09:28:10 -05:00

2.8 KiB

Project Progress: OCD Website

What Works

  • Complete project structure created according to the system patterns
  • Essential configuration files for development environment setup:
    • Docker Compose with multi-stage builds and security
    • Frontend and backend Dockerfiles with security best practices
    • Package.json files with dependencies
    • Next.js configuration with security headers
    • Tailwind CSS configuration
    • Nginx configuration with security headers
  • Core implementations:
    • Custom Video Player component with accessibility features and transcript display
    • MongoDB initialization scripts with schema validation
    • Database models with validation for Videos and Members
    • Authentication middleware with JWT and RBAC
    • Directory structure for both frontend and backend

What's Left to Build

The implementation is still pending, but now has a solid foundation. Key features that need to be built:

  1. Public-facing pages (Home, About, Calendar, Membership, Contact)
  2. Admin dashboard with JWT authentication and RBAC
  3. Event management system
  4. Membership tracking and notification system
  5. Document repository
  6. Full implementation of ASL video management with required transcripts and thumbnails
  7. Responsive design implementation with Tailwind CSS 4.0
  8. Complete database schema implementation and API endpoints
  9. Zeffy donation integration
  10. Email notification system
  11. Final deployment and testing

For a detailed breakdown of specific tasks, refer to TO_DO.txt.

Progress Status

  • Current Phase: Project structure and key files setup
  • Tasks Completed:
    • Updated technology stack to latest versions
    • Created complete directory structure according to system patterns
    • Implemented core configuration files (Docker, Nginx, Tailwind, Next.js)
    • Created MongoDB initialization scripts with schema validation
    • Implemented Video Player component with transcript display
    • Set up authentication middleware with JWT
    • Created model files with validation for Videos and Members
    • Created basic API routes structure
    • Updated implementation files (planned_implementation.txt, TECH_STACK, TO_DO.txt)
    • Enhanced database schemas with validation and indexing
    • Upgraded from WCAG 2.1 AA to WCAG 2.2 AA compliance requirements
    • Added required video transcript and thumbnail specifications
    • Implemented Docker setup with security best practices
  • Tasks In Progress: Setting up remaining API routes and controller stubs
  • Next Tasks: Install dependencies, finalize configuration, and begin implementation of Phase 1 core functionality

Current Task

Completing the creation of key files and preparing to install dependencies to resolve TypeScript errors. The next step will be to implement Phase 1 core functionality, focusing on the basic public-facing pages and admin authentication system.