lad-website/cline_docs/progress.md

4.4 KiB

Project Progress: OCD Website

Completed Features

Phase 1: Project Setup & Infrastructure

  • Initialize Next.js project with TypeScript
  • Configure project structure (app directory, API routes)
  • Set up ESLint with accessibility rules
  • Create basic layout components (Header, Footer, Navigation)
  • Implement responsive design breakpoints
  • Configure MongoDB connection
  • Set up Redis for caching
  • Implement Docker development environment
  • Create authentication middleware
  • Configure admin login system
  • Set up email service connection

Phase 2: Core Public Pages

  • Implement home page with featured events section
  • Create About OCD section pages
    • History page
    • Mission statement page
    • Board members page with photo grid
  • Implement bylaws page with document viewer
  • Create minutes archive with filtering and search
  • Develop responsive navigation system
  • Implement SEO optimization
    • Dynamic meta tags
    • Structured data for events
    • Sitemap generation
  • Create contact form with validation and email notifications
  • Implement breadcrumb navigation

Phase 3: Admin Dashboard

  • Create dashboard layout and navigation
  • Implement admin authentication and authorization
  • Develop dashboard overview with statistics
  • Create event management interface
    • Event listing with filtering
    • Event creation/editing form
    • Category management
  • Build member management interface
    • Member directory with filtering
    • Member profile editing
    • Membership status tracking
  • Implement document repository
    • Document upload and categorization
    • Permission controls (public/private)
    • Document search and filtering
  • Create content management system
    • Page listing and organization
    • WYSIWYG editor interface
    • Publish/unpublish functionality
  • Implement settings interface
    • General site settings
    • Email configuration
    • Membership settings
    • Accessibility options
  • Develop video management system
    • Video listing and organization
    • Accessibility indicators for subtitles
    • Publishing controls

In Progress Features

Phase 4: API Integration & Backend Functionality

  • Connect admin interfaces to backend API endpoints
  • Implement real data loading with state management
  • Create API error handling and recovery
  • Develop form submissions with validation
  • Build media upload functionality
  • Implement user notification system
  • Create advanced filtering for data tables
  • Develop data export functionality
  • Build search functionality across system

Phase 5: Accessibility & Refinement

  • Conduct comprehensive accessibility audit
  • Implement screen reader optimizations
  • Refine keyboard navigation
  • Add focus management system
  • Implement reduced motion alternatives
  • Create high contrast mode
  • Optimize for text resizing
  • Test with assistive technologies
  • Add accessibility documentation

Upcoming Features

Phase 6: Testing & Optimization

  • Conduct user testing with club members
  • Perform performance optimization
    • Image optimization
    • Code splitting
    • Bundle size reduction
  • Implement caching strategies
  • Conduct security audit
  • Fix identified bugs
  • Refine UI/UX based on feedback
  • Optimize database queries
  • Create automated testing suite

Phase 7: Deployment & Documentation

  • Set up production Docker environment
  • Configure Nginx and SSL
  • Implement automated backups
  • Create deployment documentation
  • Develop admin user guide
  • Create technical documentation
  • Implement monitoring and alerting
  • Conduct training session for administrators

Technical Debt & Improvements

  • Refine type definitions for stronger typing
  • Improve error boundary implementation
  • Enhance logging and monitoring
  • Create more comprehensive unit tests
  • Optimize database indexing
  • Refine component reusability
  • Consolidate duplicate styling
  • Add comprehensive JSDoc comments

Project Stats

  • Completed Tasks: 36
  • In Progress Tasks: 9
  • Upcoming Tasks: 23
  • Completion Rate: ~53%
  • Current Phase: Transitioning from Phase 3 to Phase 4
  • Next Major Milestone: Full API integration